Labels:dirt | hakham | monitor | person | sky | stairs OCR: Pre-molded bell footings Overview Above ground installation (continue] History of footings Development of ithe Bell Footing Pre-molded bell footings Review References TEST Step One Step Two Step Three Step Four STEPS: Drill 3/8 (10 mm} holes on a 45 degree angle in the footing form as indicated by the markings on the flange area at each rib location t0 accept 12" (300 mm} spikes Drive 12" {300 mm) spikes in at a 45 degree angle to prevent the footing form from rising Pour concrete using footing form inverted on top of the construction tube as a funnel PREY NEXT> moldec ifootings Developmen tootnas Beferences PREV